undergraduate thesis
Organization of Construction Project of a Small Family House
Undergraduate Thesis

Katharina Maruna (2016)
University of Split
Faculty of Civil Engineering, Architecture and Geodesy
Department of Construction Management and Economics
Metadata
TitleProjekt organizacije građenja male obiteljske kuće : završni rad
AuthorKatharina Maruna
Mentor(s)Nives Ostojić-Škomrlj (thesis advisor)
Abstract
Uređenje gradilišta je složen proces kojim je potrebno isplanirati proizvodnju kako bi se radovi odvijali nesmetano u planiranim rokovima na što ekonomičniji način. Elementi uređenja gradilišta su uglavnom privremenog karaktera, iako se mogu koristiti i neki već postojeći elementi ili elementi koji će biti dio buduće građevine. Shema uređenja gradilišta je potrebna za organizaciju radnih procesa na gradilištu, a rješava se u okviru projekta organizacije gradilišta u sklopu pripremno završnih radova. U radu je potrebno prikazati smjernice za izradu uređenja gradilišta i opisati elemente uređenja gradilišta. Potrebno je izraditi shemu uređenja gradilišta za zadanu građevinu.
Keywordsconstruction site arrangement site scheme arrangement site.
Parallel title (English)Organization of Construction Project of a Small Family House : Undergraduate Thesis
Committee MembersNives Ostojić-Škomrlj (committee chairperson)
GranterUniversity of Split
Faculty of Civil Engineering, Architecture and Geodesy
Lower level organizational unitsDepartment of Construction Management and Economics
PlaceSplit
StateCroatia
Scientific field, discipline, subdisciplineTECHNICAL SCIENCES
Civil Engineering
Construction Organization and Technology
Study programme typeprofessional
Study levelundergraduate
Study programmeCivil Engineering
Academic title abbreviationbacc. ing. aedif.
Genreundergraduate thesis
Language Croatian
Defense date2016-09-01
Parallel abstract (English)
Arranging site is a complex process which is necessary to plan production in order for construction to proceed at the planned deadlines in the most economical way. Elements of construction site are mostly temporary, although some already existing elements or some elements that will be part of the future building can be reused. The scheme of construction site is necessary for the organization of work processes at the site and is dealt with in the framework of the organization's site within the preliminary final works. The paper should present the guidelines for preparing construction site and describe the elements of construction site. It is necessary to make the scheme of construction site for a given building.
Parallel keywords (Croatian)gradilište uređenje gradilišta shema uređenja gradilišta.
Resource typetext
Access conditionOpen access
Terms of usehttp://rightsstatements.org/vocab/InC/1.0/
NotePredmet: Organizacija građenja
URN:NBNhttps://urn.nsk.hr/urn:nbn:hr:123:415126
CommitterJasna Afrić